Duygu Taş, Michel Gendreau, Ola Jabali and Raf Jans
Article (2018)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| Research Center: | CIRRELT - Interuniversity Research Centre on Enterprise Networks, Logistics and Transportation |
| PolyPublie URL: | https://publications.polymtl.ca/40766/ |
| Journal Title: | European Journal of Operational Research (vol. 273, no. 1) |
| Publisher: | Elsevier |
| DOI: | 10.1016/j.ejor.2018.07.032 |
| Official URL: | https://doi.org/10.1016/j.ejor.2018.07.032 |
| Date Deposited: | 18 Apr 2023 15:03 |
| Last Modified: | 08 Apr 2025 07:05 |
| Cite in APA 7: | Taş, D., Gendreau, M., Jabali, O., & Jans, R. (2018). A capacitated lot sizing problem with stochastic setup times and overtime. European Journal of Operational Research, 273(1), 146-159. https://doi.org/10.1016/j.ejor.2018.07.032 |
|---|---|
Statistics
Dimensions
