El-Kébir Boukas, Peng Shi and R. K. Agarwal
Paper (2000)
An external link is available for this itemDepartment: | Department of Mechanical Engineering |
---|---|
PolyPublie URL: | https://publications.polymtl.ca/28331/ |
Conference Title: | 2000 American Control Conference (ACC 2000) |
Conference Location: | Chicago, IL, USA |
Conference Date(s): | 2000-06-28 - 2000-06-30 |
Publisher: | American Autom. Control Council Danvers |
DOI: | 10.1109/acc.2000.879457 |
Official URL: | https://doi.org/10.1109/acc.2000.879457 |
Date Deposited: | 18 Apr 2023 15:21 |
Last Modified: | 25 Sep 2024 16:09 |
Cite in APA 7: | Boukas, E.-K., Shi, P., & Agarwal, R. K. (2000, June). Production control for manufacturing systems with uncertain processing time [Paper]. 2000 American Control Conference (ACC 2000), Chicago, IL, USA. https://doi.org/10.1109/acc.2000.879457 |
---|---|
Statistics
Dimensions