Matteo Fischetti, Andrea Lodi and Paolo Toth
Technical Report (2001)
Document published while its authors were not affiliated with Polytechnique Montréal
This item is not archived in PolyPublie| Additional Information: | Technical Report OR/99/1 |
|---|---|
| PolyPublie URL: | https://publications.polymtl.ca/27411/ |
| Date Deposited: | 18 Apr 2023 15:21 |
| Last Modified: | 25 Sep 2024 16:08 |
| Cite in APA 7: | Fischetti, M., Lodi, A., & Toth, P. (2001). A branch-and-cut algorithm for the multiple depot vehicle scheduling problem. (Technical Report). |
|---|---|
Statistics
Stats are not available on this system.
