Mario Bourgault, Élisabeth Lefebvre, Louis-André Lefebvre, Robert Pellerin
and Elie Elia
Paper (2002)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| PolyPublie URL: | https://publications.polymtl.ca/26811/ |
| Conference Title: | 35th Annual Hawaii International Conference on System Sciences |
| Publisher: | Institute of Electrical and Electronics Engineers |
| DOI: | 10.1109/hicss.2002.993883 |
| Official URL: | https://doi.org/10.1109/hicss.2002.993883 |
| Date Deposited: | 18 Apr 2023 15:20 |
| Last Modified: | 08 Apr 2025 02:16 |
| Cite in APA 7: | Bourgault, M., Lefebvre, É., Lefebvre, L.-A., Pellerin, R., & Elia, E. Discussion of metrics for distributed project management: preliminary findings [Paper]. 35th Annual Hawaii International Conference on System Sciences. https://doi.org/10.1109/hicss.2002.993883 |
|---|---|
Statistics
Dimensions
