<  Back to the Polytechnique Montréal portal

Scheduling Issues for Environmentally Responsible Manufacturing: the Case of Hoist Scheduling in an Electroplating Line

C. Subai, Pierre Baptiste and E. Niel

Article (2006)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
PolyPublie URL: https://publications.polymtl.ca/22469/
Journal Title: International Journal of Production Economics (vol. 99, no. 1-2)
Publisher: Elsevier
DOI: 10.1016/j.ijpe.2004.12.008
Official URL: https://doi.org/10.1016/j.ijpe.2004.12.008
Date Deposited: 18 Apr 2023 15:18
Last Modified: 18 Apr 2023 15:18
Cite in APA 7: Subai, C., Baptiste, P., & Niel, E. (2006). Scheduling Issues for Environmentally Responsible Manufacturing: the Case of Hoist Scheduling in an Electroplating Line. International Journal of Production Economics, 99(1-2), 74-87. https://doi.org/10.1016/j.ijpe.2004.12.008

Statistics

Dimensions

Repository Staff Only

View Item View Item