C. Subai, Pierre Baptiste and E. Niel
Article (2006)
An external link is available for this itemDepartment: | Department of Mathematics and Industrial Engineering |
---|---|
PolyPublie URL: | https://publications.polymtl.ca/22469/ |
Journal Title: | International Journal of Production Economics (vol. 99, no. 1-2) |
Publisher: | Elsevier |
DOI: | 10.1016/j.ijpe.2004.12.008 |
Official URL: | https://doi.org/10.1016/j.ijpe.2004.12.008 |
Date Deposited: | 18 Apr 2023 15:18 |
Last Modified: | 18 Apr 2023 15:18 |
Cite in APA 7: | Subai, C., Baptiste, P., & Niel, E. (2006). Scheduling Issues for Environmentally Responsible Manufacturing: the Case of Hoist Scheduling in an Electroplating Line. International Journal of Production Economics, 99(1-2), 74-87. https://doi.org/10.1016/j.ijpe.2004.12.008 |
---|---|
Statistics
Dimensions