Article (2007)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| PolyPublie URL: | https://publications.polymtl.ca/21976/ |
| Journal Title: | International Journal of Flexible Manufacturing Systems (vol. 19, no. 2) |
| Publisher: | Springer |
| DOI: | 10.1007/s10696-007-9022-8 |
| Official URL: | https://doi.org/10.1007/s10696-007-9022-8 |
| Date Deposited: | 18 Apr 2023 15:16 |
| Last Modified: | 08 Apr 2025 02:09 |
| Cite in APA 7: | Fournier, X., & Agard, B. (2007). Improvement of Earliness and Lateness by Postponement on an Automotive Production Line. International Journal of Flexible Manufacturing Systems, 19(2), 107-121. https://doi.org/10.1007/s10696-007-9022-8 |
|---|---|
Statistics
Dimensions
