<  Back to the Polytechnique Montréal portal

Uncertainty and variability in EBPR stoichiometry consequences for process modelling and optimization

Dwight Houweling, Yves Comeau, Imre Takacs and Peter Dold

Paper (2009)

This item is not archived in PolyPublie
Department: Department of Civil, Geological and Mining Engineering
PolyPublie URL: https://publications.polymtl.ca/19454/
Conference Title: 2nd IWA Specialized Conference
Conference Location: Krakow, Poland
Conference Date(s): 2009-09-06 - 2009-09-09
Date Deposited: 18 Apr 2023 15:14
Last Modified: 05 Feb 2025 13:38
Cite in APA 7: Houweling, D., Comeau, Y., Takacs, I., & Dold, P. (2009, September). Uncertainty and variability in EBPR stoichiometry consequences for process modelling and optimization [Paper]. 2nd IWA Specialized Conference, Krakow, Poland.

Statistics

Stats are not available on this system.

Repository Staff Only

View Item View Item