Mohamed Sabar, Benoît Montreuil and Jean-Marc Frayret
Paper (2009)
An external link is available for this item| Department: | Department of Mathematics and Industrial Engineering |
|---|---|
| PolyPublie URL: | https://publications.polymtl.ca/19000/ |
| Conference Title: | IFAC Symposium on Information Control Problems in Manufacturing |
| Conference Location: | Moscow, Russia |
| Conference Date(s): | 2009-06-03 - 2009-06-05 |
| Publisher: | Elsevier |
| DOI: | 10.3182/20090603-3-ru-2001.0253 |
| Official URL: | https://doi.org/10.3182/20090603-3-ru-2001.0253 |
| Date Deposited: | 18 Apr 2023 15:15 |
| Last Modified: | 08 Apr 2025 02:05 |
| Cite in APA 7: | Sabar, M., Montreuil, B., & Frayret, J.-M. (2009, June). An agent-based algorithm for personnel scheduling and rescheduling in assembly centers [Paper]. IFAC Symposium on Information Control Problems in Manufacturing, Moscow, Russia. https://doi.org/10.3182/20090603-3-ru-2001.0253 |
|---|---|
Statistics
Dimensions
