<  Back to the Polytechnique Montréal portal

Multiple yard cranes scheduling for loading operations in a container terminal

Lu Chen and André Langevin

Article (2011)

An external link is available for this item
Department: Department of Mathematics and Industrial Engineering
PolyPublie URL: https://publications.polymtl.ca/17088/
Journal Title: Engineering Optimization (vol. 43, no. 11)
Publisher: Taylor & Francis
DOI: 10.1080/0305215x.2010.548865
Official URL: https://doi.org/10.1080/0305215x.2010.548865
Date Deposited: 18 Apr 2023 15:12
Last Modified: 08 Apr 2025 01:44
Cite in APA 7: Chen, L., & Langevin, A. (2011). Multiple yard cranes scheduling for loading operations in a container terminal. Engineering Optimization, 43(11), 1205-1221. https://doi.org/10.1080/0305215x.2010.548865

Statistics

Dimensions

Repository Staff Only

View Item View Item